CPD
Chemical Purification Department
Project’s scope of activity:
• System and Power Cabinets designed and equipped with DCS DeltaV (Emerson Process Management);
• Commissioning, start-up and tests of Process Control System (controllers, IO products, power and distribution, control network, workstation hardware and software);
• Number of I/O signals: up to 404.
Project documentation:
• Hardware Design Specification
• Drawings
• Connection diagrams
• Software Design Specification
• Hardware Test Specification
• Software Test Specification
Year / Status:
2004 / Finished