TSP Plant

Triple superphosphate

 

Project’s scope of activity:

• System and Power Cabinets designed and equipped with DCS DeltaV (Emerson Process Management);

• Commissioning, start-up and tests of Process Control System (controllers, IO products, power and distribution, control network, workstation hardware and software);

• Number of I/O signals: up to 1024.

 

Project documentation:

• Drawings

• Connection diagrams

• Factory Acceptance Test

 

Year / Status:

2005 / Finished