AVD-1
Atmospheric-Vacuum Distillation
Project’s scope of activity:
• System and Power Cabinets designed and equipped with DCS DeltaV (Emerson Process Management);
• Number of I/O signals: up to 1150.
Project documentation:
• Drawings
• Connection diagrams
• Factory Acceptance Test
Year / Status:
2007 / Finished